Franke Central Services – Stoke

The Worksmart Storage team were approached by a large manufacturer based in Stoke, to look at increasing the storage capacity for their spare parts division while downsizing to a more modern facility.  Their existing storage was spread over a number of levels on a mix of shelving, louvre panels, desks and containers and a better solution for access and efficiency was asked for. Our storage team came up with a number of layouts which allowed for growth while making access easy.

Our in-house CAD designer then helped modify the previous layout to increase the capacity whilst making better use of the available height.  A modular rivet shelving system was specified due to the available load capacity and flexibility giving over 168m2 of storage space.

Even with some last minute modifications to the design, the project was installed on time and on budget. The layout provided a modern, clean and efficient storage area.