Kilncraig Reception – Office Refurbishment – Alloa

Kilncraig Reception – Office Refurbishment – Alloa

Posted

20th September 2017

@

11:10 am

Worksmart were appointed by Clackmannanshire Council through Martec to carry out the installation of an anti-bandit screen in their Kilncraig office’s reception.

The main feature of this project was a faceted high-level security screen on a curved reception desk. A consideration of this job was making sure the glass could still be used without obstructing communication, making the glass functional and practical. We utilised a Komfort 110 strongpost system with horizontal transom above the counter for access and single glazed polar to take 11.5mm anti-bandit glass.

The entire project took one week to frame, procure and install, with a one week lead time on materials. This office refurbishment resulted in another happy client for Worksmart.

[post_gallery]

Client Name:

Clackmannanshire Council

Project Type:

Reception Counter Installation

Architect:

Get in touch

For more information about Worksmart or to enquire about our services, please fill in the form below.

    [wpgdprc “By using this form you agree with the storage and handling of your data by this website.”]

    Client Testimonial

    Worksmart Brochure

    Please take a seat and look through some shining examples of our work from the last two decades of working smart.

    Download Make it Worksmart Brochure

    Worksmart Contracts

    Take a look at our new 2022
    Worksmart Contracts brochure.

    Download Worksmart Contracts Brochure
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo