Office Glazed Partitioning Glasgow | Edrington | Worksmart Contracts
Make it Worksmart

Worksmart Contracts - Part of the Make it Worksmart Group

01563 53 55 11

Edrington Group – Office Glazed Partitioning – Glasgow

Edrington Group – Office Glazed Partitioning – Glasgow

Posted

21st September 2017

@

1:50 pm

Worksmart, in conjunction with Morris and Spottiswood, recently completed a complete refurbishment of Edrington Group’s offices in Glasgow, including glazed partitioning installations.

Worksmart were responsible for installing the partitioning on levels 4 to 7 of this job. The scope of works consisted of a Sektor 115 Demountable Partitioning System, as well as Single and Double Glazed Partitioning and Double Glazed doors provided by Sektor. These components were installed by  our skilled tradesmen at Worksmart.

In addition to this, we installed a 120/0 rated fire screen as well as 120/0 fire rated doors. This was another successful office glazed partitioning project for the Worksmart team.

Client Name:

Morris and Spottiswood on behalf of Edrington Group

Project Type:

Glazed Partitioning Installations

Architect:

Form Design Consultants

Get in touch

For more information about Worksmart or to enquire about our services, please fill in the form below.

    By using this form you agree with the storage and handling of your data by this website.

    Client Testimonial

    Worksmart Brochure

    Please take a seat and look through some shining examples of our work from the last two decades of working smart.

    Download Make it Worksmart Brochure

    Worksmart Contracts

    Take a look at our new 2021
    Worksmart Contracts brochure.

    Download Worksmart Contracts Brochure
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo
    accreditation logo