Arlington Baths – Glasgow

Refurbishment of a grade A listed period property in the heart of Glasgow’s City Centre. Mosaic tiling, feature painting, antique electrical items and bespoke rimex pelmet which is back lit completes the new Turkish area within Arlington Baths. The whole design, concept and materials had to comply with the room temperature being between 110-120 degrees at all times.

Arlington Baths

Project Type:Refurbishment
Value:£60,000
Duration:2 weeks
Architect:Worksmart
Download Full Case Study